Tag Archives: North Conduit Avenue

New routes proposed in Howard Beach, Ozone Park for Jamaica Bay Greenway


| slicata@queenscourier.com

THE COURIER/Photo by Salvatore Licata

Howard Beach and Ozone Park will be home to new bike routes on the Jamaica Bay Greenway, according to the Department of Transportation (DOT).

The only problem is figuring out where.

The DOT has been hosting community workshops and asking for the input of residents on where they think the new routes are best for safety and convenience.

Currently, the Greenway is an 11-mile bike path that hugs Jamaica Bay, connecting Brooklyn and Queens.

It runs through Howard Beach, through Broad Channel to the Rockaways and then across the Marine Park Bridge to Brooklyn.

The DOT said there has been strong advocacy by residents for the Greenway to be expanded to Ozone Park to connect to the soccer and baseball fields on Conduit Avenue, across the street from Resorts World Casino.

For this connection, the DOT proposed using 155th Avenue or 156th Avenue.

While it’s looking to add new stretches to the Greenway, the DOT is also hoping to improve existing ones, like the part that connects the Joseph P. Addabbo Memorial Bridge to the Belt Parkway in Howard Beach.

One is to use 84th Street, a two-way road, instead of the existing paths on 91st Street and 92nd Street, which are both one-way. This would give both cars and cyclists more room on the street, said Alice Friedman, the DOT’s project manager for the Greenway.

The other option would be to add a path where 78th Street meets the Belt Parkway and use the existing grass area along Spring Creek to connect to the Addabbo Bridge.

Finally, there is a plan to build a route through Spring Creek connecting the parkway and the bridge. But Freidman mentioned that would be a long-term plan.

For the path on the Addabbo Bridge, which connects Broad Channel and Howard Beach, the DOT proposed three options:

  • Keep the path the way it exists with one lane on each side of the bridge,
  • Move the parking lane out and let the bike lane hug the sidewalk on both sides, or
  • Put two bike lanes on the south side of the bridge next to each other.

Most people found the last option the most viable for this section but would like to see an actual barrier between the car and bike lanes.

When all community workshop events are finished, the DOT will draft a finalized plan of what it believes it should look like, based on the residents’ input and their own planning.

The DOT expects to have the draft finished by the spring of 2015.

RECOMMENDED STORIES

 

New shopping center coming to Ozone Park


| lguerre@queenscourier.com

Rendering courtesy Platinum Realty

A new shopping center is being built in a vacant lot in Ozone Park, and owners are planning to have it completed in time for Christmas.

Platinum Realty Associates plans to build a one-story center on the plot of land where Cross Bay Boulevard and North Conduit Avenue intersect. The project is scheduled to be completed by Dec. 1 and could house as many as 10 tenants.

The firm hopes to secure a supermarket as the anchor tenant, but has not confirmed one as of yet.

In the rendering obtained by The Courier, there are parking spaces for the stores, but a company official could not confirm the exact number of spots that will be available.

 

RECOMMENDED STORIES 

NEWS YOU CAN USE: Ozone Park Fall Festival this Saturday


| brennison@queenscourier.com

NEWS YOU CAN USE:

Ozone Park Fall Festival this Saturday

A Fall Festival will be held between noon and 3 p.m. this Saturday at Addabbo Playground on North Conduit Avenue between 81st and 82nd streets.

The festival is sponsored by Councilmember Eric Ulrich.

There will be face painting, a pumpkin patch, fall crafts and a bounce house.

For more information call 718-318-4000.